Post

Tudor Ave. works, Dec 7–11

Kiran of Saanich Waterworks has provided the following map of works for the Tudor project this week (Dec 7–11).

Phyllis St. and Baynes St. will be closed; the fire lane will be open between 8am–4pm, Monday through Friday. 

Leave a Reply