Post

Penrhyn right-of-way structure is not a “site trailer”

(CBRA was cc’d this letter by Jerry Donaldson, addressed to Mike Lai, Director of Engineering at the District of Saanich).  Dear Mr. Lai: Re:  2580/2588 Penrhyn Street, Abstract Developments I confirm my telephone discussion with Steve Wong of the Engineering Department today.  Mr. Wong told me that Abstract Developments obtained from him, today,  a boulevard… Continue reading Penrhyn right-of-way structure is not a “site trailer”